Commissioning the system
4. "
" to confirm

Naming the heating circuits

In the delivered condition, the heating circuits are des-
ignated "Heating circuit 1", "Heating circuit 2",
"Heating circuit ..." (if installed).
If the system user prefers, the heating circuits can be
renamed to suit the specific system.

Entering heating contractor contact details

The system operator can call up contact details when
required and notify the heating contractor.
1.
2. Select "Information".

Checking the static pressure and supply pressure

Danger
CO formation as a result of incorrect burner
adjustment can have serious health implications.
Always carry out a CO test before and after
work on gas appliances.
Commissioning, inspection, maintenance
(cont.)
5. "Commissioning"
To enter names for heating circuits:
Operating instructions
3. Select "Service contact details".
4. Fill in each field and confirm with OK.