Viessmann Vitovalor PT2 E11T Installation And Service Instructions Manual page 14

Table of Contents

Advertisement

Preparing for installation
Preparing for installation
Connections on the water side with connection set (standard delivery)
110
62
F
E
D
C
B
A
Fig. 6
A
Heating return R
¾
Cold water R
B
½
DHW circulation R
C
½
DHW R
D
½
Depending on the layout of the modules: Connections
towards the free side on the cylinder module to the
right or left.
Note
All height dimensions have a tolerance of +15 mm on
account of the adjustable feet.
1. Prepare the connections on the heating water side.
Thoroughly flush the heating system.
Note
Fit the on-site expansion vessel (if required) to the
heating return.
14
(cont.)
(accessory)
G
A
B
C
D
E
F
E
Heating flow R
¾
Manometer and drain valve
F
Gas shut-off valve
G
2. Prepare the connections on the DHW side. Install
the safety assembly (accessories or on-site provi-
sion) in the cold water line to DIN 1988 and
EN 806 (see page 32).
Recommendation:
Install the safety valve above the DHW cylinder.
This protects the valve against contamination, scal-
ing and high temperatures.
3. Prepare gas connection to TRGI [or local regula-
tions].

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents