Checking The Alignment; Operating The X-Ray - Planmeca proline xc Installation Manual

Hide thumbs Also See for proline xc:
Table of Contents

Advertisement

4

CHECKING THE ALIGNMENT

4.1 Operating the X-ray

Switching the unit on
Installation manual
Connect the unit to a dedicated power supply with a volt-
age appropriate to the unit you are installing.
Switch the unit on. The on/off switch is located on the
underside of the vertical carriage. When you switch the
unit on the main display will be shown on the graphic
user interface and the unit will carry out a self-test which
will last a few seconds.
The unit is then ready for use.
The same switch is used to switch the X-ray off.
NOTE The unit incorporates a self-checking feature
that monitors the operation of the unit. If there is
a malfunction or an operating error the unit will
stop working and an error message will appear
on the GUI. The error message must be cleared
from the display before the unit can be used
again. To clear the message, touch the OK field.
Refer to the technical manual for a list of error
messages and what they mean.
NOTE A help message is shown on the GUI if the select-
ed function is not allowed. The help message
disappears when you cancel the action or re-
lease the exposure button.
CHECKING THE ALIGNMENT
Planmeca Proline XC X-ray unit 13

Advertisement

Table of Contents
loading

Table of Contents