Planmeca proline xc Installation Manual page 14

Hide thumbs Also See for proline xc:
Table of Contents

Advertisement

INSTALLING THE X-RAY
Transportation pin
Rotating unit
Column
10 Planmeca Proline XC X-ray unit
Remove the transportation pin, clamping screw and
packing piece that lock the rotating unit to the vertical car-
riage.
Also remove the counterweight locking screw and clamp
plate from the rear of the column and the two transporta-
tion pins that hold the vertical carriage in position during
shipping. These should be kept with the X-ray in case the
X-ray needs to be moved at some future date.
The long transportation pin that holds the rotating unit in
position is used to check that the unit is correctly aligned.
Clamping screw
Vertical carriage
Transportation pins
Counterweight
locking screw and
clamp plate
Installation manual

Advertisement

Table of Contents
loading

Table of Contents