Siemens RMB795B Basic Documentation page 15

Central control unit for room controllers rxb/rxl and room thermostats rdg/rdf/rdu
Hide thumbs Also See for RMB795B:
Table of Contents

Advertisement

Wiring
Storage and transport
Maintenance
Faults
Disposal
Siemens
Building Technologies
When wiring the system, strictly segregate the AC 230 V section from the AC 24 V
safety extra-low voltage (SELV) section to ensure protection against electric shock
hazard!
For storage and transport, observe the limits from the relevant data sheets at all
times.
If in doubt, contact your supplier or Siemens Building Technologies.
Synco™ 700 products are maintenance-free and require only cleaning at regular
intervals. We recommend removing dust and dirt from system components
installed in the control panels during standard service.
If system faults occur and you are not authorized to perform diagnostics and rectify
faults, call your Siemens Building Technologies service representative.
Only authorized staff may perform diagnostics, remedy faults, and restart the plant.
This also applies to working within the panel (e.g. testing or changing fuses).
Do not dispose of devices with electrical and electronic components as part of
domestic waste.
Observe all local legislation.
Central control unit RMB795B
Overview
15 / 144
CE1P3122en
18.01.2012

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents