Engine Reassembly; Crankshaft - Suzuki DR-Z70 Service Manual

Table of Contents

Advertisement

ENGINE REASSEMBLY

Reassemble the engine in the reverse order of disassembly.
The following steps require special attention or precautionary
measures should be taken.
NOTE:
Apply engine oil to each running and sliding part before reas-
sembling.

CRANKSHAFT

• When installing the crankshaft into the left crankcase, it is
necessary to pull its left end into the left crankcase with the
special tools.
09910-32812: Crankshaft installer
09910-32860: Crankshaft installer spacer
09911-11310: Attachment
Never fit the crankshaft into the crankcase by striking
it with a plastic mallet. Always use the special tool,
otherwise the accuracy of crankshaft alignment will be
affected.
CRANKSHAFT SHIM SELECTION
• Degrease the right crankshaft web, shim and inner race of the
right crankshaft bearing.
• Place the removed shim 1 on the right crankshaft.
• Put the plasti-gauge (special tool) 2 cut out about 10 mm on
the shim as shown.
09900-22301: Plasti-gauge
• Install the right crankcase and tighten the crankcase bolts to
the specified torque.
Crankcase bolt: 10 N·m (1.0 kgf-m, 7.0 lb-ft)
Never rotor the crankshaft when a piece of plasti-
gauge is installed.
• Remove the crankcase bolts.
• Separate the crankcase with the special tool. (
• Measure the width of compressed plasti-gauge with the enve-
lope scale.
Crankshaft thrust clearance:
0.02 to 0.07 mm (0.0008 – 0.0027 in)
3-18)
ENGINE
3-52

Advertisement

Table of Contents
loading

Table of Contents