Figure 1-22 Bnc Connectors; Figure 1-23 Bnc Connectors To The Of The 8990B - Keysight 8990B Installation Manual

Peak power analyzer
Hide thumbs Also See for 8990B:
Table of Contents

Advertisement

1
Getting Started
3 Now, attach cables to the rear panel BNC connectors of the 8990B and route them
Figure 1-22
4 Let the end of the cable(s) that passes under the 8990B just dangle for now.
Figure 1-23
54
through the openings at the support tray and under the 8990B as shown below
(later, these cables will be connected to the bottom trim plate BNC connectors so
you can have access to these BNCs once the 8990B is installed in the rack).
BNC connectors
Step 8
will have you attach the cable(s) to the bottom trim plate BNCs. Also
plug the power cord into the 8990B and route it through the back so you can
plug it into a power outlet after installation.
BNC connectors to the rear of the 8990B
Keysight 8990B Installation Guide

Advertisement

Table of Contents
loading

Table of Contents