Download Print this page

Keysight E8362-60109 Installation Note page 17

Extended frequency range upgrade kit

Advertisement

Install the Old Front Panel LED Board onto the New Front Panel (Refer to
1. Remove the LED board from the old front panel by removing the three retaining screws
x
(item
).
2. Place the LED board in position on the new front panel and attach it with the three screws
x
(item
) removed from the old front panel.
Figure 10 Front Panel LED Board Reinstallation
Install the New Couplers on the New Front Panel (Refer to
1. Place the new couplers onto the new front panel. Orient them the same as the old ones as
shown in
Figure
9.
2. Install a flange nut (item
a 1-inch torque wrench, tighten each flange nut to 72 in-lbs.
3. Reconnect the two cables (item
page
16.
Install the New Front Panel on the Analyzer (Refer to
1. Place the new test set deck front panel, with the new LED board and both new couplers
attached, onto the test set deck as shown in
2. Using a T-10 TORX driver, loosely reinstall the eight screws (items
the front panel to the test set deck. Torque each of the eight screws to 9 in-lbs in the order
indicated (
through
3. Reconnect the wrapped wire cable (item
Installation Note E8362-90004
z
) removed from the old couplers, onto each new coupler. Using
y
) to the test port couplers that were disconnected on
). This is important to ensure proper alignment.
x
Figure
Figure
Figure
9.
) to the front-panel LED board.
Figure
9.)
9.)
through
) to secure
10.)
17

Advertisement

loading