Download Print this page

Keysight E8362-60109 Installation Note page 16

Extended frequency range upgrade kit

Advertisement

Replace the Test Set Deck Front Panel and the A25 and A26 Test Port Couplers
Remove the Existing Test Set Deck Front Panel (Refer to
1. Disconnect the wrapped wire cable (item
2. Disconnect the remaining RF cable (item
3. Using a T-10 TORX driver, remove eight screws (items
front panel, to release it.
4. Remove the test set deck front panel from the analyzer, with the LED board and both
couplers attached.
5. Using a 1-inch wrench, remove the flange nut (item
flange nuts for installation of the new couplers. Discard the front panel and the couplers.
Figure 9
Test Set Deck Front Panel Replacement
16
Figure
x
) from the front-panel LED board.
y
) from each test port coupler.
through
z
) from each coupler. Retain the
Installation Note E8362-90004
9.)
) from the test set deck

Advertisement

loading