Removing Or Installing The Customer Power Control (Cpc) Cable; Removing Or Installing A Line Interface Coupler (Llc) Or Its Cable - IBM 3745 Series Connection And Integration Manual

Communication controller/nways multiprotocol controller
Table of Contents

Advertisement

Step
4
You have finished this procedure
If you have no other connection procedures to do, close and lock the
door using the special door key.
Removing or Installing the Customer Power Control (CPC) Cable
Note: The CPC cable and connector are not provided by IBM, and, therefore, are
not shown here; neither are given the details of securing the CPC cable in place.
Step
1
Starting
If you have not done the procedure "Getting Started" on page 1-2, do
so now.
If you are only plugging in the CPC cable, go to Step 3.
Otherwise, continue with the next step.
Step
2
Unplugging the
CPC
cable
Remove CPC cable from CPC connector. See Figure 1-3 on page 1-6
or Figure 1-4 on page 1-7.
If you are not plugging in the CPC cable, go to Step 4.
Step
3
Plugging in the
CPC
cable
1. Find the cable with a label that matches the connector.
2. Install the cable into the CPC connector.
Step
4
You have finished this procedure
If you have no other connection procedures to do, close and lock the
door using the special door key.
Removing or Installing a Line Interface Coupler (LIC) or Its Cable
For L1C types 5 and 6, refer to the LICSI6 Migration and Integration Guide,
SA33-0416 or earlier version of the Connection and Integration Guide, SA33-0129.
LIC Slots: Regardless of the number of ports (lines) that are actually used, four
line numbers are allocated for each L1C slot in an LI U 1. These slots hold L1C types
1,3, and 4.
1-18
3745 All Models
&
3746-900: CIG
0 · .: