IBM 3745 Series Connection And Integration Manual page 110

Communication controller/nways multiprotocol controller
Table of Contents

Advertisement

0
Step
4
When the IPL has completed phase 4, the following message is
displayed for each CCU undergoing I PL:
IPL PHASE 4 ENABLED CA
xxx ..•
If other messages appear or the letter
U
appears anywhere after
CA,
refer to the Basic Operations Guide, SA33-0177, for an explanation.
Step
5
Call the host operator and ask for the control program(s) to be loaded
into your communication controller. Let the IPL continue, no additional
3745 operator action is required.
Step
6
When the IPL is finished, the following message is displayed once for
each CCU undergoing IPL:
IPL COMPLETE
If other messages appear, refer to the Basic Operations Guide,
SA33-0 177, for an explanation.
0
§]
Go to Step 15.
Step
7
@]00B
Step
8
Select CCU A.
CD
then [ Enter)
0
Step
9
§]
Step
10
8@J0
B
When this message is displayed:
MOSS-ONLINE
continue with the next step.
Step
11
@]00B
0
Step
12
Select CCU B.
o
then
( Enter)
Step
13
§]
Step
14
8@JG]
( Enter)
When this message is displayed:
MOSS-ONLINE
continue with the next Step
Step
15
@]@]0
8
Step
16
o
I
Enter)
0
Step
17
Enter the port number xxx:
000
[Enter)
Chapter 5. Integration Procedures
5-11

Advertisement

Table of Contents
loading

Table of Contents