Closing Down - M&C PSS Series Instruction Manual

Portable gas conditioning unit
Hide thumbs Also See for PSS Series:
Table of Contents

Advertisement

20

Closing down

N O T E
No special measures are to be taken in the event of short-term shutdowns of the gas conditioning
system.
In the case of long-term shutdowns, for example after a completed series of measurements, it is
recommended to purge the gas conditioning system with fresh air or inert gas. A flushing time of 3 to
5 minutes is sufficient under normal conditions. Condensate residues must also be removed from the
system.
W AR N I N G
40
The area where the gas conditioning unit is placed must remain
frost-free even when the unit is switched off.
Aggressive condensate is possible.
Wear protective glasses and proper protective clothing!
PSS-5C | 1.02.02
www.mc-techgroup.com