Si33-102.book Page 43 Tuesday, June 26, 2001 3:18 PM
SiE33-102
WHEN ELECTRIC WIRING WORK IS FINISHED
Check drainage flow during COOL running, explained under "TEST OPERATION".
WHEN ELECTRIC WIRING WORK IS NOT FINISHED
Remove the electric parts box lid, connect a power supply and remote control to the terminals.
Next, press the inspection/test operation button "
test operation mode. Press the operation mode selector button "
OPERATION "
start up. Check that the water has drained from the unit. Press "
FXYD-Ceiling
1. Install the drain pipes.
Mounted Duct Type
Keep piping as short as possible and slope it downwards so that air may not remain trapped inside the
(Low Silhouette
pipe.
Type)
Keep pipe size equal to or greater than that of the connecting pipe. (vinyl pipe of 26 mm nominal diam.).
Use the attached clamp and drain hose.
Tighten the clamp firmly.
Insulate the clamp with the attached sealing pad.
Insulate the drain pipe inside the building.
Drain piping may be clogged with dust and may result in water leakage and property damage.
When obliged to install the indoor units in a dusty place, cover the drainpan by field supplied to prevent
dust from falling into it.
While installing indoor units, take care that dust etc. should not drop into the drainpan.
It is nessesary to clean the drainpan.
General Information
" on the remote control. The unit will engage the
". Then, press the ON/OFF button "
". The indoor unit fan and drain pump will
: http://splitoff.ru/tehn-doc.html
Installation
" until selecting FAN
" to go back to the first mode.