Si33-102.book Page 41 Tuesday, June 26, 2001 3:18 PM
SiE33-102
WHEN ELECTRIC WIRING WORK IS FINISHED
Check drainage flow during COOL running, explained under "TEST OPERATION".
WHEN ELECTRIC WIRING WORK IS NOT FINISHED
Remove the electric parts box lid, connect a power supply and remote control to the terminals.
Next, press the inspection/test operation button "
test operation mode. Press the operation mode selector button "
OPERATION "
start up. Check that the water has drained from the unit. Press "
Note that the fan also starts rotating.
FXYK-ceiling
1. Install the drain pipes.
mounted corner
Keep piping as short as possible and slope it downwards so that air may not remained trapped inside
cassette
the pipe.
Keep pie size equal to or greater than that of the connecting pipe (Vinyl pipe of 25 mm nominal diam.
and 32 mm outer diam.).
Use the attached drain hose and clamp. Tighten the clamp firmly.
Insulate the clamp with the attached sealing pad.
Insulate the drain hose inside the building.
General Information
" on the remote control. The unit will engage the
". Then, press the ON/OFF button "
". The indoor unit fan and drain pump will
Switch box
cover (1)
Switch box
cover (2)
P1 P2 F1 F2 T1 T2
Terminal board for
remote control (6P)
[Method of adding water]
: http://splitoff.ru/tehn-doc.html
Installation
" until selecting FAN
" to go back to the first mode.
Power supply
terminal board (2P)
L
N
Power supply
Lead cable for remote control
3PA60996-10L
41