Si33-102.book Page 39 Tuesday, June 26, 2001 3:18 PM
SiE33-102
WHEN ELECTRIC WIRING WORK IS NOT FINISHED
Remove the electric parts box lid, connect a power supply and remote control to the terminals.
Next, press the inspection/test operation button "
the test operation mode. Press the operation mode selector button "
OPERATION "
start up. Check that the water has drained from the unit. Press "
You can check whether drainage is satisfactory or not by removing the access opening lid and checking
the water level of the drain pan through the access opening.
Be careful when doing so because the fan is turning at the same time.
FXYF-4-way blow
1. Rig drain piping
ceiling mounted
The diameter of the drain pipe should be greater than or equal to the diameter of the connecting pipe
cassette
(vinyl tube; pipe size: 25mm; outer dimension: 32mm).
Keep the drain pipe short and sloping downwards at a gradient of at least 1/100 to prevent air pockets
from forming.
If the drain hose cannot be sufficiently set on a slope, execute the drain raising piping.
To keep the drain hose from sagging, space hanging wires every 1 to 1.5 m.
General Information
" on the remote control. The unit will engage
". Then, press the ON/OFF button "
". The indoor unit fan and drain pump will
: http://splitoff.ru/tehn-doc.html
Installation
" until selecting FAN
" to go back to the first mode.