Epson ELPMB62 Installation Manual page 11

Hide thumbs Also See for ELPMB62:
Table of Contents

Advertisement

Touch unit (included with BrightLink 1485Fi/1485Fi+)
The following parts are packaged with your projector (BrightLink 1485Fi/1485Fi+) and are necessary when
attaching the touch unit. When installing the touch unit on a non-magnetic screen or whiteboard, you will
also need three M4 screws.
Marker (x2)
Tape (approx. 2.4 inches
[6 cm]) for securing the
markers (×12)
Infrared deflector (approx.
11.2 inches [28.5 cm]) (×12)
Optional touch unit bracket
The following parts are packaged with the optional touch unit bracket and are necessary when attaching the
touch unit above the frame of a whiteboard. When installing the bracket, you will also need four (4) M4 wood
screws or M4 anchor bolts (not included).
Touch unit bracket
socket head cap bolt (×2)
Touch unit
Label (×4)
M4 × 25 mm hexagon
11
Spacer for screw holes (×3)
Touch unit connection cable
Touch unit template sheet
Bracket template sheet
Hexagon wrench (for
M4 bolts)

Advertisement

Table of Contents
loading

Table of Contents