ADT FOCUS 200 PLUS Installation And Setup Manual page 9

Commercial fire and burglary security system with scheduling
Hide thumbs Also See for FOCUS 200 PLUS:
Table of Contents

Advertisement

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Installing Cabinet Lock ................................................................................................................................. 2-2
Cabinet Attack Resistance Considerations.................................................................................................... 2-3
Cabinet Door Tamper Wiring ........................................................................................................................ 2-3
Mounting the PC Board ................................................................................................................................. 2-4
Details of the Operating Panel Circuit Board ............................................................................................... 3-2
Figure 4-2:
4-Wire Smoke Detector Connections Points 1-8............................................................................................. 4-4
Figure 4-3:
Style "D" Configuration on Points 3 and 4.................................................................................................... 4-4
PID Gateway Module ..................................................................................................................................... 5-4
PID Wiring Connections to System-Powered Sensors................................................................................. 5-10
Basic Sensor Connections to PID................................................................................................................. 5-11
Basic Sensor Connections to PID................................................................................................................. 5-11
Connections of BA Sensors with Field Wiring Terminals to PID............................................................... 5-12
Using a PID to Turn On a PA400W Sounder ............................................................................................. 5-12
SIM Gateway Module .................................................................................................................................. 5-14
SIM Wiring to System-Powered and Nonpowered Sensors ........................................................................ 5-18
Connection for a Gateway Loop Powered SIM Sensor................................................................................ 5-19
SIM Wiring to a Horn and Strobe ............................................................................................................... 5-19
SIM Wiring to a Sensor ............................................................................................................................... 5-20
SIM Connections to a Vault Vibration Sensor ............................................................................................ 5-20
SIM Connections to a 4-Wire/2-Wire Adapter ............................................................................................ 5-21
Loop Interface Module ................................................................................................................................. 5-22
Loop Interface Module Wiring to Powered Sensor ...................................................................................... 5-23
Loop Interface Module Wiring to Lacing/Foil and Non-powered Sensor .................................................. 5-23
RF Gateway Wiring Connections................................................................................................................. 5-24
RF Receiver DIP Switch Settings ................................................................................................................ 5-26
External Sounder Connections to the Bell Outputs ...................................................................................... 6-6
External Sounder Connections to the Auxiliary Relay ................................................................................. 6-7
Installing the 472402A Backup Dialer.......................................................................................................... 7-3
AC Communicator Module Wiring ................................................................................................................ 8-2
AC Communicator Module Wiring Using AC Telephone Lines.................................................................... 8-3
AC Communicator Module Wiring Using DVACS or RS232 Port ............................................................... 8-3
AC Communicator Module Wiring Using DC Telephone Lines ................................................................... 8-4
Configuration of the 7720P to the J5 Output Triggers ................................................................................. 9-4
Configuration of the 7830R to the J5 Output Triggers ................................................................................. 9-5
Configuration of the 7835C to the J5 Output Triggers ................................................................................. 9-5
Configuration of the 7920SE to the J5 Output Triggers............................................................................... 9-6
Access Control Interface Unit (ACIU).......................................................................................................... 10-3
Typical Installation Using Card Reader or Keyreader............................................................................. 10-10
Typical Installation Using a Keylok.......................................................................................................... 10-10
Modifying ACIU for Operation with Dorado 7401 or 7901 Card Reader ................................................ 10-11
Printer Interface Unit................................................................................................................................... 11-2
Figure 12-1:
Load Diagram for RS-485 Bus .................................................................................................................... 12-5
Figure 12-2:
Load Diagram for RS-485 Bus with Power Supply.................................................................................... 12-6
Determining the Voltage Drop on the RS-485 Bus...................................................................................... 12-7
Operating Panel ........................................................................................................................................... 19-1
Summary of Connections .......................................................................................................Inside Back Cover
List of Figures
ix

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents