Mid-Mount Switch I/O Ports Facing Front Configuration; Flush Mount Switch I/O Ports Front Configuration - Enterasys 7100G Series Hardware Installation Manual

Table of Contents

Advertisement

Mounting the 7100G-Series Switch
Figure 2-4
1
Ear mount screw removal
2
Rack mount ear pivot screw
3
Reposition of rack mount ear

Mid-Mount Switch I/O Ports Facing Front Configuration

The mid-mount, switch I/O ports facing front configuration is depicted in callout 3 of
on page 2-3. This rack mount configuration requires repositioning the rack mount ears on both
sides of the device.
To reposition the rack mount ears for this configuration:
1.
Unscrew the two rack mount ear screws as shown by callout 1 of
2.
Reposition the rack mount ear, shown by callout 2, with the middle and power supply side
screw holes.
3.
Reinsert the two rack mount ear screws, shown by callout 3.
4.
Repeat steps 1–3 on the other side of the chassis.
2-8 Installation

Flush Mount Switch I/O Ports Front Configuration

4
Ear mount screw insertion
5
Pivot screw retightened
Figure 2-5
Figure 2-1
on page 2-9.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

71g21k2l2-48p71g11k2l2-4871g21k2l2-24p24

Table of Contents