Mid-Mount Power Supply Facing Front Configuration; Mid-Mount Switch I/O Ports Facing Front Configuration - Enterasys 7100G Series Hardware Installation Manual

Table of Contents

Advertisement

Figure 2-5

Mid-Mount Switch I/O Ports Facing Front Configuration

1
Ear mount screw removal
2
Reposition of rack mount ear

Mid-Mount Power Supply Facing Front Configuration

The mid-mount, power supply facing front, configuration is depicted in callout 4 of
page 2-3. This rack mount configuration requires repositioning the rack mount ears on both sides
of the device.
To reposition the rack mount ears for this configuration:
1.
Unscrew the two rack mount ear screws as shown by callout 1 of
2.
Reposition the rack mount ear towards the switch I/O ports end of the device, shown by
callout 2 and the thick black arrow. The three-holed ear is now located in the middle of the
device, still facing the power supply side.
3.
Reinsert the two rack mount ear screws, shown by callout 3.
4.
Repeat steps 1–3 on the other side of the chassis.
Mounting the 7100G-Series Switch
3
Ear mount screw insertion
Figure 2-6
Enterasys 7100G-Series Hardware Installation Guide 2-9
Figure 2-1
on
on page 2-10.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

71g21k2l2-48p71g11k2l2-4871g21k2l2-24p24

Table of Contents