Installation; Checks Before Unpacking; Unpacking The Unit - Air Techniques ProVecta 3D Prime Installation Instructions Manual

Hide thumbs Also See for ProVecta 3D Prime:
Table of Contents

Advertisement

Installation

7
Installation
NOTICE
Danger to components due to elec-
trostatic discharge (ESD)
Always switch off the operating volt-
i
EN
age before carrying out any assembly
US
or installation work on the device
Before and during the installation or
i
assembly work on the device, make
sure that the person carrying out the
work is earthed
NOTICE
Risk of equipment damage
Do not push or pull the unit during in-
stallation by holding on to the C-shaped
arm or the handle for the patient
Move the unit carefully and only grip it
i
by the telescopic column
7.1 Checks before unpacking
Visually inspect the packaging for damage
i
Check to see if the Shockwatch display has
i
been activated
WARNING
HANDLE WITH CARE
20
Check to see if the Tiltwatch display has been
i
activated
C
C
Tiltwatch
A
A
U
U
T
T
I
I
O
O
N
N
If the Shockwatch or Tiltwatch display is acti-
i
vated or there is damage to the packaging, do
not unpack the unit; contact the shipping
company
7.2 Unpacking the unit
The unit is supplied on a special pallet and is
split into several parts on delivery We recom-
mend using two persons to transport each part
individually from the delivery location to the in-
stallation site To ensure that the parts are still
protected during transport, do not remove the
foam packaging, protective films etc
Remove the lid from the outer carton
i
Remove the outer carton
i
Take out the accessories carton and the car-
i
ton with cross-member and C-shaped arm
and place to one side
1
1
Accessories carton
2
Carton with cross-member and C-shaped
arm
2
2210200497L41 1812V002

Advertisement

Table of Contents
loading

Table of Contents