Installation
EN-
Installation
US
6
Requirements
6.1
Installation/setup room
The room chosen for set up should fulfil the fol-
lowing requirements:
– Closed, dry room
– It should not be a room made for another pur-
pose (e.g. boiler room or wet cell)
– Ambient conditions correspond to "4 Techni-
cal data".
– Do not cover cooling slots or openings if you
install the unit in a housing and provide for suf-
ficient clearance to the openings to permit suf-
ficient cooling.
16
7
Installation
7.1
Setting up the unit
Where a waste water connection is available,
❯
conduct the fluids directly via the waste water
hose into the waste water outlet.
Secure the unit against rolling away.
❯
7.2
Remove the transport locks
Open the screw cap.
❯
ATH7100005L29 2011V004