Commissioning And First Start-Up; Switch The Device On - Air Techniques ProVecta 3D Prime Installation Instructions Manual

Table of Contents

Advertisement

Remove the adjustment cam and screw it
i
back on in the required position of the unit
Move the unit to the maximum height level of
i
the unit
Check that there is enough space between
the upper part of the housing and the ceiling
2210200497L41 1812V002
2250 mm
88,6 in
2100 mm
82,7 in
8
Commissioning and first
start-up
NOTICE
Short circuit due to the build-up of
condensation
Do not switch on the unit until it has
i
warmed up to room temperature and
is dry
The required tests (egacceptance test) must
be done in accordance with local rules and reg-
ulations
Find out which tests are required
i
Carry out testing in accordance with local
i
rules and regulations
8.1 Switch the device on
CAUTION
Danger of injury by moving C-shaped
arm
After the unit is switched on and the pa-
rameters are confirmed on the touch
screen, the C-shaped angle connector
piece is positioned Persons can be in-
jured during this
Nobody may be present in the area of
i
the C-shaped arm while the unit is be-
ing switched on
Use the main power switch to switch the unit
i
on
Installation
EN
US
39

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ProVecta 3D Prime and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents