System Start-Up6" Recirculating Evaporative Cooling

System Start-Up

7
8
49046, 49046-3, 49046-4
Item
Description
1
Water Level Indicator Bubble
2
Initial Water Level Minimum
3
Initial Water Level Maximum
4
Hose Clamp
27
1. Partially fill Trough with water.
2. Flush dirt and debris from the Trough by removing the Sump Drain Cap.
3. Set Initial Water Level
For 49046, 49046-3, and 49046-4
Refill system with water. With the Hose Clamp (Item 4) loose, raise/lower the
3/4" Pipe (Item 5) to adjust the Initial Water Level. Use the Water Level Indicator
Bulb (Item 1) to set Initial Water Level height as shown and Re-tighten the Hose
Clamp (See Figure 27. below).
For 49046-5, and 49046-6
Refill system with water. Loosen the Float ball Adjustment Bolt (Item 11) and
move Float Ball to appropriate notch in the valve arm (Item 10) to adjust the Initial
Water Level using the Water Level Indicator Bulb as shown.
4. Check that the Float Ball is not rubbing against the side of the Sump.
5
4
9
Item
5
6
7
8
1-1/2" Rubber Pipe Cap
Figure 27.Securing the Water Supply Inlet Hose
7
1
3
2
6
8
49046-5, 49046-6
Description
Item
3/4" PVC Pipe
9
Sump
10
Float Ball
11
11
10
Description
Sump Inlet Support Bracket
Valve Arm
Float Ball Adjustment Bolt
MV1669U

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Turbo-Cool and is the answer not in the manual?

Questions and answers

Table of Contents