Framing For System With Sump In The Middle; Splash Guard And Pipe Hanger Installation - Chore-Time Turbo-Cool Installation & Operator's Instruction Manual

With open top 6" recirculating evaporative cooling
Table of Contents

Advertisement

Framing Information6" Recirculating Evaporative Cooling

Framing for System with Sump in the Middle

1
4
Figure 3.Frame opening dimensions for Sump in middle

Splash Guard and Pipe Hanger Installation

Note: The end holes in the Splash Guard must align with the chalk line and the end of the
first Splash Guard must be flush with the inside of the end framing. (See Figure 4.)
Secure the Splash Guards to the upper stringer, using a 1/4 x 1-1/2'' Lag Screw at each end. Secure the
Pipe Hangers to the stringer, through the Splash Guard, using (4) 1/4 x 1-1/2'' Lag Screws. Install the
remaining Splash Guards butting them tightly end to end. If the last Splash Guard is too long to fit
within the end framing, cut as shown and fasten the loose end to the Stringer with a 1/4 x 1-1/2" Lag
Screw.
5
6
10
2
3
6
4
3
Figure 4.Pipe Support and Splash Guard Installation
Item
MV968-32 6/99
1
5
2
Description
1
6" [152.4 mm] Minimum Clearance
for Trough End Insert
2
Cover this opening
3
18" [458 mm]
4
1/2 Total System Length rounded
to nearest 5' increment
5
Remainder of Total System Length
6
Total System Length
plus 18" [458 mm]
Note: See Figure 2 for all other framing
information
Item
Description
1
1/4 x 1-1/2'' Screw
2
Pipe Hanger
1
3
Splash Guard
4
Upper Stringer
5
Chalk Line
6
Flush with edge
of end framing
7
Cut here if too long
1
7
6
3
MV1669U

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Turbo-Cool and is the answer not in the manual?

Questions and answers

Table of Contents