Commissioning Sequence; Activation; Testing The Function - Baumuller BM4-O-CAN-06 Operating Instructions Manual

Cansync-master option module for bm4-o-plc
Table of Contents

Advertisement

6.5

Commissioning sequence

To find out how to eliminate the cause of the error, refer to
turbances –
6.5
Commissioning sequence
Commissioning is divided into the following procedures:

1 Activation.

2 Testing the function.

6.5.1
Activation.
m Read and observe the
m You must have carried out correctly section "Assembly and Installation".
m Switch on the b maXX 4400 basic unit.
NOTE
You must not remove or plug in the CANsync-Master option module while the b maXX 4400
basic unit is switched on. Switch the unit off first.
6.5.2
Testing the function
After activation, the LEDs flash one after the other (as described in
tializing –
If a complete application is present, LED H1 then shows receiving and sending of mes-
sage frames on the CANsync bus.
32
Operating Instructions CANsync-Master Option Module for BM4-O-PLC BM4-O-CAN-06
Document No.: 5.02056.01A
von 56
from page 35 onward.
ZGeneral safety regulations –
on page 31).
ZFinding and eliminating dis-
from page 29 onward.
Baumüller Nürnberg Electronic GmbH & Co. KG
ZActivating and ini-

Advertisement

Table of Contents
loading

Table of Contents