Dismantling, Storage; Safety Regulations; Requirements Of The Personnel Carrying Out Work; Dismantling - Baumuller BM4-O-CAN-06 Operating Instructions Manual

Cansync-master option module for bm4-o-plc
Table of Contents

Advertisement

In this chapter, we will describe how you decommission the CANsync-Master option mod-
ule for b maXX PLC and store it.

11.1 Safety regulations

h Observe the
WARNING
The following may occur, if you do not observe this warning information:
m serious personal injury
Danger from: electricity.The unit carries dangerous voltage and current and residual charges
in the intermediate circuit.
Ensure that all the electrical connections have been deenergized and are secured against re-
starting.
Wait until the intermediate circuit has discharged before starting any dismantling work. The
capacitors that are used in the unit have discharged automatically 10 min. after the supply
voltage is switched off such that you can dismount the connections without any risk.
Before starting work on the electrical connections, use appropriate measuring equipment to
ensure that the connections are dead.
Do not dismount the connections until you are certain that they are dead.

11.2 Requirements of the personnel carrying out work

The personnel that carries out dismantling must have the necessary knowledge and have
been trained appropriately to carry out this work. Choose these persons such that they
understand and can apply the safety instructions printed on the unit and parts of it and on
the connections.

11.3 Dismantling

h Make available the following material before starting dismantling:
Operating Instructions CANsync-Master Option Module for BM4-O-PLC
D
ISMANTLING
11
ZBasic Safety Instructions –
m death
,
STORAGE
from page 7 onward.
BM4-O-CAN-06
41
von 56

Advertisement

Table of Contents
loading

Table of Contents