FULTON Endura+ Series Installation And Operation Manual page 23

Condensing hydronic boilers
Table of Contents

Advertisement

SECTION 2
Figure Notes:
1. Pipe must be level or slightly pitched toward the drain.
2. Pipe material must be CPVC, high-temperature silicone
tubing, galvanized steel, or stainless steel.
3. The condensate drain trap outlet must be below the
condensate outlet of the boiler.
4. The maximum capacity to attach per condensate drain
kit is 4 MMBH total.
BMP
KDB
N/A
N/A
N/A
10/5/2016
10/5/2016
BMP
KDB
N/A
N/A
N/A
7/28/2016
7/29/2016
- - - -
- - - -
- - - -
- - - -
- - - -
B.O.M.
ELEC. ENG MECH. ENG CHECKED
APPROVED
REVISION HISTORY
Questions? Please Contact Your Local Manufacturer's Representative
EDRP-IOM-2019-0212
This design and drawings
DRAWN BY:
UNLESS OTHERWISE NOTED
The items shown in this
DIMENSIONS ARE IN INCHES
B. PALMER
are proprietary and are the
TOLERANCES
drawing may be covered by
exclusive property of
FRACTION &
1/8
one or more patents of
WHOLE VALUE
Fulton Group N.A., Inc.
CHECKED BY:
(1) PLACE DEC.
0.03
Fulton Group N.A., Inc.
The corporation does not
(2) PLACE DEC.
0.015
(3) PLACE DEC.
0.005
permit their use except
ANGLE
0.5 DEG
with prior written consent.
SURFACE FINISH
B.O.M. REVIEW
250 MICRO-INCHES
THIRD ANGLE PROJECTION
1 OF 1
FIGURE 11 - CONDENSATE DRAIN PIPING FOR INDIVIDUAL ENDURA+ BOILER
MECH. ENG:
JOB NUMBER:
4/11/2016
ELEC. ENG:
PROJECT NAME:
APPROVED BY:
PROJECT MANAGER:
K.D.B.
4/19/2016
INSTALLATION
SIDE VIEW
BACK VIEW
DESCRIPTION:
ENDURA+ SINGLE BOILER CONDENSATE DRAIN
PIPING DIAGRAM
HOUSEKEEPING PAD
MINIMUM 4-INCH (102 MM)
FLEXIBLE DRAIN HOSE
(SUPPLIED, REQUIRED)
REDUCING BUSHING
(NOT PROVIDED)
Fulton Group N.A., Inc
972 Centerville Road
Pulaski, New York USA 13142
DRAWING NUMBER
G-36-100011
SHEET 1 OF 1
2-17
REV
B