Summary of Changes
The following changes were made for the 2nd revision of this manual.
Date
07/2001
Overview of Contents
The following paragraphs briefly describe the contents of each chapter.
Chapter 1, Preparation and
MVME2100 and its main integrated PMC and PC•MIP boards. The
remainder of the chapter includes an explanation of the installation
procedure, including preparation and jumper setting information.
Chapter 2, Operating
operational functions of the MVME2100 including tips on applying
power, a description of the switch settings, the status indicators, standard
jumper settings, I/O expansion and PMCspan slots.
Chapter 3, Functional
functional components on the MVME2100. The chapter includes a listing
of the MVME2100 features and a block diagram. The remainder of the
chapter includes specific descriptions of each functional element on the
board and a description of its functional characteristics.
Chapter 4, PPCBug
diagnostics firmware including a listing of the initialization sequence, a
brief explanation of how to use PPCBug and a description of the standard
list of debugger and diagnostic commands.
xvi
Doc. Rev
V2100A/IH2
A correction was made on page
explanation of the jumper settings for Flash Bank A
and B. Flash Bank B (0) is the factory setting.
Appendix B, Specifications, was also updated.
Other corrections were made throughout the
manual. This section titled "About this Manual"
was also added.
Instructions, provides a description of the
Description, provides an explanation of the
Firmware, describes the PPCBug debugger and
Changes
Installation, provides a description of the
1-5
to change the