JR
ADJUSTABLE QUARTER GLASS JR-27 (Continued)
Fig. 5 FORWARD JACK SCREW ADJUSTMENT
1 - JACK SCREW ADJUSTMENT
2 - QUARTER TRIM PANEL
3 - SPEAKER OPENING
(4) Raise quarter glass and position correctly. (Fig. 4)
(5) Tighten all fasteners.
(6) Install center and rear side rail weatherstrips
to side rail weatherstrip retainer channels.
(7) Cycle quarter glass between full up and full down
positions. Verify operation and adjust as necessary.
Fig. 4 QUARTER GLASS ADJUSTMENT SPECIFICATIONS
ADJUSTABLE QUARTER GLASS JR-27
Fig. 6 IN/OUT ALLEN ADJUSTMENT
1 - SPEAKER OPENING
2 - TRIM PANEL HOLE
3 - QUARTER TRIM PANEL
4 - ALLEN WRENCH
(8) Install quarter trim panel. (Refer to 23 -
BODY/INTERIOR/QUARTER
INSTALLATION)
23 - 97
PANEL
TRIM
-