Installer Manual Siata V132-SFE-EV-VIRIDION - Programming
Third regeneration cycle duration
Note
The duration of the regeneration cycle can be set from 0 (OFF) to 99 minutes.
Set the third regeneration cycle duration.
A
Use
and
to set the duration.
B
Press
to validate and switch to the next parameter.
Fourth regeneration cycle duration
Note
The duration of the regeneration cycle can be set from 0 (OFF) to 99 minutes.
Set the fourth regeneration cycle duration.
A
Use
and
to set the duration.
B
Press
to validate and switch to the next parameter.
Chlorine cell control
Note
This option activate the chlorine producer control cell.
Note
For the boards without chlorine cell management hardware, even if the chlorine control is
activated, there will not be power in the back terminal ports 7-8. So it is not possible to
produce Cl.
Set the chlorine cell control.
A
Use
and
to set the control cell.
B
Press
to validate and switch to the next parameter.
56 / 110