BEST ACCESS SYSTEMS W Series Service Manual page 195

Table of Contents

Advertisement

Preparing the door and door jamb
5
Install latch
1 Install the latch in the door.
Note: The latch tube prongs should be centered and
should project into the chassis hole.
2 Check that the door swings freely.
6
Use drill jig to drill through-bolt holes
(9KW only)
1 Press the drill jig (KD303) onto the door, engaging it
with the latch tube prongs. Make sure the front edge
of the jig is parallel with the door edge.
2 Drill the through-bolt holes (5/16" diameter) halfway
into the door.
3 Turn the drill jig over and repeat steps 1 and 2 from the
opposite side of the door.
Note: Replace the drill jig after 10 door preparations.
Installation Instructions for 83KW/93KW–85KW/95KW IDH Max Cylindrical Locks
Installation Instructions for 83KW/93KW–85KW/95KW IDH Max Cylindrical Locks
BEST ACCESS SYSTEMS
Indianapolis, Indiana
Latch tube prong
Latch
Chassis hole
Figure 5
Installing the latch in the door
Inside of door
Figure 6
Installing the drill jig and drilling the
through-bolt holes
Inside of door
Drill upper through-
bolt hole.
Latch tube prongs
Drill lower through-
bolt hole.
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

35hw83kw93kw34hw85kw95kw ... Show all

Table of Contents