Removing the Side Cutting Unit Lift Arm Assembly (continued)
Installing the Side Cutting Unit Lift Arm Assembly
Groundsmaster® 1200 Pull-Behind Rotary Mower
18235SL Rev A
g264331
1.
Flange bushing (2 each)
2.
Lift arm assembly
7. If necessary, remove the grease fitting (item 4 in
(1) and straight bushings (3) from the lift arm assembly (2).
8. Thoroughly clean the lift arm assembly bores (2).
1. If removed, install the grease fitting (4), flange bushings (1) and straight
bushings (3) to the lift arm assembly (2).
2. Position the lift arm assembly onto the main frame assembly and secure
with the lift arm pin.
3. Install the yoke joint and cutting unit connection to the side cutting unit lift
arm; refer to
Installing the Lift Arm Joint Yoke (page
4. Install the impact arm assembly to the frame assembly; refer to
Impact Arm Assembly (page
5. Install the lift cylinder to the side cutting unit lift arm; refer to
Cutting Unit Lift Cylinder (page
6. Install the cutting unit covers.
7. Lubricate the grease fittings (4) after the assembly is complete; refer to
Groundsmaster 1200 Operator's Manual.
8. Prior to returning the machine to service, raise and lower the cutting unit to
verify that hydraulic hoses and fittings do not contact anything throughout
the full range of movement.
Figure 12
3.
Straight bushing (2 each)
4.
Grease fitting
3–24).
4–10).
Page 3–13
Figure
12), flange bushings
3–16).
Installing the
Installing the
Chassis: Service and Repairs

Advertisement

Table of Contents
loading

Table of Contents