Installation And Startup; Transport And Unpacking; Disposal Of Packaging Materials; Scope Of Supply - Sirona Cerec AC Operating Instructions Manual

Dental cad/cam system acquisition unit
Hide thumbs Also See for Cerec AC:
Table of Contents

Advertisement

Sirona Dental Systems GmbH
Operating Instructions for the Acquisition Unit Sirona Dental CAD/CAM System
63 33 582 D3492
D3492.201.01.09.23 09.2011
6

Installation and startup

Installation and startup
6.1

Transport and unpacking

Transport and unpacking
Transport and unpacking
All Sirona products are carefully checked prior to shipment. Please
perform an incoming inspection immediately after delivery.
1. Check the delivery note to ensure that the consignment is complete.
2. Check whether the product shows any visible signs of damage.
NOTICE
Damage during transport
If the product was damaged during transport, please contact your
carrying agent.
If return shipment is required, please use the original packaging for
shipment.
Removing the monitor
To prevent damage to the LCD monitor, it must be removed during
transport of the unit.
6.2

Disposal of packaging materials

Disposal of packaging materials
The packaging must be disposed of in compliance with the relevant
national regulations. Please observe the regulations applicable in your
country.
6.3

Scope of supply

Scope of supply
The detailed scope of supply is specified in the document "Scope of
supply".
6 Installation and startup
21

Advertisement

Table of Contents
loading

Table of Contents