Installation And Startup; Transport And Unpacking; Disposal Of Packaging Materials; Scope Of Supply - Sirona Cerec AC Operating Instructions Manual

Dental cad/cam system with cerec bluecam
Hide thumbs Also See for Cerec AC:
Table of Contents

Advertisement

6 Installation and startup

6.1 Transport and unpacking

26
6
Installation and startup
Transport and unpacking
6.1
All products from Sirona are carefully checked prior to shipment. Please
perform an incoming inspection immediately after delivery.
1. Check the delivery note to ensure that the consignment is complete.
2. Check whether the product shows any visible signs of damage.
NOTE
Damage during transport
If the product was damaged during transport, please contact your
carrying agent.
If return shipment is required, please use the original packaging for
shipment.
To prevent damage to the LCD monitor, it must be removed during
transport of the unit.

Disposal of packaging materials

6.2
The packaging must be disposed of in compliance with the relevant
national regulations. Please observe the regulations applicable in your
country.
6.3

Scope of supply

The detailed scope of supply is specified in the document "Checklist".

Sirona Dental Systems GmbH

Operating Instructions CEREC AC

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cerec ac

Table of Contents