Installation And Startup; Transport And Unpacking; Disposal Of Packaging Materials; Scope Of Supply - Sirona Cerec AC Operating Instructions Manual

Acquisition unit with cerec omnicam
Hide thumbs Also See for Cerec AC:
Table of Contents

Advertisement

6 Installation and startup
6.1 Transport and unpacking
28
6

Installation and startup

6.1

Transport and unpacking

All products from Sirona are carefully checked prior to shipment. Please
Transport and unpacking
perform an incoming inspection immediately after delivery.
1. Check the delivery note to ensure that the consignment is complete.
2. Check whether the product shows any visible signs of damage.
NOTICE
Damage during transport
If the product was damaged during transport, please contact your
carrying agent.
If return shipment is required, please use the original packaging for
shipment.
To prevent damage to the LCD monitor, it must be removed during
Removing the monitor
transport of the unit.
6.2

Disposal of packaging materials

The packaging must be disposed of in compliance with the relevant
national regulations. Please observe the regulations applicable in your
country.
6.3

Scope of supply

The detailed scope of supply is specified in the document "Checklist".
Sirona Dental Systems GmbH
Operating Instructions for the Acquisition Unit CEREC AC
D3492.201.06.15.02 12.2015
63 81 136 D3492

Advertisement

Table of Contents
loading

Table of Contents