Adjusting The Booms To Level - Toro Multi Pro 1750 Operator's Manual

Turf sprayer, serial no. 400000000 and up
Hide thumbs Also See for Multi Pro 1750:
Table of Contents

Advertisement

1. Nylon bushings
2. Pivot pin
4.
Remove the bolt and nut that secure the pivot
pin, and remove the pin
5.
Remove the boom and pivot bracket assembly
from the center frame to access the nylon
bushings.
6.
Remove and inspect the nylon bushings from
the front and back sides of the pivot bracket
(Figure
57).
Note:
Replace any worn or damaged bushings.
7.
Place a small amount of oil on the nylon
bushings, and install them into pivot bracket
(Figure
57).
8.
Install the boom and pivot bracket assembly into
the center frame, aligning the holes
9.
Install the pivot pin and secure it with the bolt
and nut removed in step 4.
10.
Repeat steps
2
outer-boom section.
Adjusting the Booms to
Level
Use the following procedure to adjust the level of the
left and right booms sections when they are in the
spray position.
1.
Extend the booms to the spray position.
2.
Remove the cotter pin from the pivot pin
58).
Figure 57
3. Bolt
(Figure
57).
(Figure
through
9
for the other
g022367
1. Actuator
2. Actuator rod
3. Boom-pivot pin housing
3.
Lift up on the boom and remove the pin
58), and slowly lower the boom to the ground.
4.
Inspect the pin for any damage and replace it
if necessary.
5.
Use a wrench on the flat sides of the actuator
rod to immobilize it, then loosen the jam nut to
allow the eyelet rod to be adjusted
57).
1. Flat on the actuator rod
(Figure
2. Jam nut
3. Eyelet
4. Jam nut loosened
56
Figure 58
4. Cotter
5. Pin
(Figure
Figure 59
5. Eyelet adjusted
6. Eyelet position for
assembly
7. Jam nut tightened to lock
new position
g013780
(Figure
59).
g014220

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multi pro 41188

Table of Contents