4. Commissioning
4.1
Commissioning procedure
3
1
Step 1
Checking the valve/cylinder combinations (see pneumatics manual)
2
Step 2
Checking the I/O assignment
3
Step 3
Commissioning the CPX terminal on the field bus and checking the
address assignment, if necessary, without connected actuators by
means of LED (see manual for CPX field bus node)
Fig. 4/1: Commissioning steps
4−4
In order to avoid connecting and addressing errors, you
should carry out commissioning in steps as follows. The indi
vidual commissioning steps are shown in the diagram below.
Ô Ô
Ô Ô
Ô Ô Ô Ô
Ô
Ô
Ô Ô
Festo P.BE−CPX−SYS−EN en 0503b
2
1