3
Startup procedure
3.1

Introduction

CAUTION!
EQUIPMENT DAMAGE
Always follow the startup procedure. Damage to the Rosemount
failure to follow this procedure.
The Rosemount CT5800 normally operates continuously. It should only be necessary to
start up the instrument under the following circumstances.
3.2

Preparation for use

The analyzer must be installed and fully commissioned prior to startup.
WARNING!
BURNS
Do not touch any part of the analyzer. Assume all parts of the analyzer are hot unless it has
been switched off and allowed to cool down. Some parts of the analyzer may be heated to 65 °C
(150 °F). Always wear proper protective equipment when handling the analyzer.
Failure to allow sufficient cooling may cause serious burn injury to personnel. If burns occur,
seek immediate medical treatment.
Quick Start Guide
When the Rosemount CT5800 is first switched on following installation.
Following repair or maintenance.
When it has been switched off as part of a plant shutdown or maintenance.
Switch off the analyzer and allow it to cool for at least two hours before fitting,
removing, or performing any maintenance.
The analysis cell is insulated against heat loss. Allow the analyzer to cool for at least
twelve hours before performing any maintenance on, or in the vicinity of, the analysis
cell.
Startup procedure
CT5800 may result from a