Analyzer cabinet installation

Transporting the analyzer cabinet
Unpacking the analyzer cabinet
Mounting the analyzer cabinet
GAA330-M EMISSION MONITORING SYSTEM
CAUTION
The analyzer cabinet weighs approx. 110 kg. A suitable lifting device
(crane, block and tackle, lifting truck, etc.) is required for transport, set-
ting upright and installation!
Note
It is strongly recommended that the analyzer cabinet is transported by a
specialist firm, transported in a horizontal position as far as possible and
not set upright until immediately before the installation!
Lift out the analyzer cabinet from the shipping box.
Do not remove the plastic sheet in which the analyzer cabinet is
wrapped. Unpacking a cold analyzer cabinet can lead to condensation.
Remove the plastic sheet only once the analyzer cabinet is at room tem-
perature. This takes at least 24 hours.
Observe the installation site requirements.
The loading capacity of the wall must be high enough to bear the weight
of the analyzer cabinet.
Follow the "Layout plan" in the drawings set.
Use only the vibration dampers delivered with the analyzer cabinet.
1
Mount the 4 vibration dampers to the wall using M8 bolts or studs.
2
Hang the analyzer cabinet on all 4 vibration dampers simultaneously.
3
Tighten all screws of the analyzer cabinet.
4
Ground the analyzer cabinet by means of the central grounding screw,
route the grounding cable (≥ 10 mm
gland.
|
OI/GAA330-M-EN REV. C
2
/AWG 6) through the M16 cable
35