Back-Purging Unit: Installation Site And Air Supply Requirements - ABB GAA330-M Operating Instructions Manual

Emission monitoring system for marine applications
Table of Contents

Advertisement

20

Back-purging unit: Installation site and air supply requirements

Design of the back-purging unit
Distance to sampling probe
Protection from adverse conditions
Compressed-air supply requirements
GAA330-M EMISSION MONITORING SYSTEM
The back-purging unit consists of a protective cabinet with shut-off valve,
6 bar pressure reduction valve, solenoid valves for back-purging, pressure
regulator and 5 l compressed air receiver for effective pressure pulses also
with lower airflow rate.
The distance between the back-purging unit and the sampling probe must
not exceed 5 m (length of the steel-braided compressed-air hoses = 6 m).
Protect the back-purging unit against
Water spray
Contact with chemicals
Strong sunlight and heat radiation
Strong air currents
Heavy dust load
Corrosive atmospheres
Vibration
Dry (dew point < 3 °C), oil- and dust-free
max. 6 bar for back-purging
approx. 4 bar as control air (required for 2-stage back-purging with type
PFE2 filter unit)
required flow rate approx. 100 m
CAUTION
If the compressed air is not dry and clean, this will result in damage to the
sample conditioning components (valves, filters, sample gas cooler, sam-
ple gas feed unit) as well as to the gas analyzer.
|
OI/GAA330-M-EN REV. C
3
/h

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents