Requirements For The Installation Site Of The Analyzer Cabinet - ABB ACF5000 Manual

Multi-component ftir analyzer system
Table of Contents

Advertisement

22

Requirements for the installation site of the analyzer cabinet

Short gas paths
Protection from adverse ambient conditions
Climatic conditions
NOTICE
ACF5000 FTIR ANALYZER SYSTEM
The analyzer cabinet should be set up as close as possible to the meas-
uring location. A short sample gas line translates into short dead times.
Because of the pressure drop in the line and the required electrical pro-
tection, the length of the heated sample gas line must not exceed 60
meters when connected to 230 VAC and 40 meters when connected to
120 VAC. Depending on the altitude of the installation site, these values
may be lower.
The test gas bottles should be set up as close as possible to the analyzer
cabinet.
The analyzer cabinet must be protected from
Jets of water,
Contact with chemicals,
Strong sunlight and heat,
Strong air currents
Extremely dusty environments,
Corrosive atmosphere
Vibration.
Ambient temperature for storage and transport
Ambient temperature during operation
with built-in fan (option)
With built-in air conditioner (option)
Relative humidity during operation
Annual average
briefly
seldom and slight condensation permissible if the analyzer system is
switched on and the FTIR spectrometer is purged
The analyzer cabinet should be packaged during storage and transport!
|
OI/ACF5000-EN REV. A
−25 to +65°C
+5 to +30°C
+5 to +45°C
max. 75%
max. 95%

Advertisement

Table of Contents
loading

Table of Contents