Regular Maintenance Tasks - ABB GAA330-M Operating Instructions Manual

Emission monitoring system for marine applications
Table of Contents

Advertisement

Regular maintenance tasks

Daily
Weekly
Every 6 months
Every 12 months
GAA330-M EMISSION MONITORING SYSTEM
NOTE
Prior to performing any maintenance works on the analyzer system be sure
to activate the "Maintenance Mode" on the "Control Panel" screen thus set-
ting the "Maintenance Mode" status signal.
Be sure to reset this setting after finishing the maintenance work.
Visual inspection of the analyzer cabinet
Check of flow meter for constant flow
Check status of LEDs for error signals
Automatic calibration: Zero-point calibration with ambient air and end-
point calibration with calibration cells (is predefined in the system and
will be executed automatically once a week)
Cleaning of ceramic filter from the sampling probe, if required use com-
pressed air carefully
If required: emptying of condensate collecting flask, universal filter and
acid filter
CAUTION
Condensate is corrosive, handle accordingly!
As weekly, additionally:
Change of the filter element in the universal filter
Change of the acid filter
Change of the filter element in the cabinet fan
Cleaning of ceramic filter from the sampling probe
As every 6 months, additionally:
Change of hose at the hose pump from gas cooler
Change of water trap
Seal integrity check
Adjustment of calibration cells with test gas
|
OI/GAA330-M-EN REV. C
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents