Materials Needed For Installation (Not Supplied) - ABB GAA330-M Operating Instructions Manual

Emission monitoring system for marine applications
Table of Contents

Advertisement

22

Materials needed for installation (not supplied)

Gas sampling
Gas lines
Cable specifications
GAA330-M EMISSION MONITORING SYSTEM
Wall tube with mounting flange (DN 65, PN 6, facing type A to EN 1092-1)
Sample gas (unheated line)
Sample gas outlet
Test gas N
2
Test gases 1, 2, 3
Instrument air
Condensate collecting bottle
Analyzer cabinet supply
Input wiring
Grounding cable
Connection between analyzer cabinet and filter unit / sampling probe
GAA330-M with filter unit PFE3 and heated probe type 42
Probe type 42 input wiring
Probe type 42 signal lines (Pt100)
Filter unit PFE3 input wiring
Filter unit PFE3 valves (back-purging)
Filter unit PFE3 signal lines (1 x Pt100)
GAA330-M with filter unit PFE2 and heated probe type 42
(probe type 42 is connected to PFE2 terminal box)
Filter unit PFE2 input wiring
Filter unit PFE2 probe and antifreeze heating
Filter unit PFE2 valves (back-purging)
Filter unit PFE2 signal lines (2 x Pt100)
|
OI/GAA330-M-EN REV. C
PTFE pipe 4/6x1 mm
PTFE pipe 4/6x1 mm
PTFE pipe 4/6x1 mm
PTFE pipe 4/6x1 mm
Stainless steel pipe, 6 mm O.D., or
compressed-air hose
(plus pressure gauge and shut-off valve)
PVC tube 4/6x1 mm
3 x 1.5 mm
≥ 10 mm
2 x 1.5 mm
2 x 0.75 mm
4 x 1.5 mm
4 x 1.5 mm
2 x 0.75 mm
4 x 1.5 mm
4 x 1.5 mm
4 x 1.5 mm
4 x 0.75 mm
2
2
2
2
2
2
2
2
2
2
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents