Water Connection; Connection To The Cold Water Supply Only - Miele PW 814 Operating And Installation Instructions

Commercial washing machine
Table of Contents

Advertisement

Water connection

Water pressure (flow pressure) of a minimum 100 kPa (1 bar) /
maximum 1000 kPa (10 bar) is required to guarantee problem-free
programme operation.
The machine must be connected to the water supply using the inlet
hoses provided.
New hose-sets supplied with the appliance are to be used. Old hose-
set should not be re-used.
Useful tip: The hot water supply must not exceed a maximum
temperature of 70 °C.

Connection to the cold water supply only

The Y-piece is supplied with the machine.
A non-return valve supplied separately with the machine is required
between the mains water tap and Y-piece.
Installation and connection
73

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pw 811Pw 818

Table of Contents