Water Connection - Miele PWM 912 Operating And Installation Instructions

Commercial washing machine
Table of Contents

Advertisement

Installation
46
Unscrew the screws at the bottom of the back panel and remove
the panel.
Loosen the hexagonal screws to remove the shipping struts.
Keep the shipping struts. They must be re-assembled before trans-
porting the machine.

Water connection

Water pressure (flow pressure) of a minimum 14.5 psi (100 kPa)/max.
145 psi (1000 kPa) is required to guarantee problem free program
operation.
The machine must be connected to the water supply using the inlet
hoses provided.
Hoses must be replaced with hoses tested for a burst pressure of at
least 1015 psi (7000 kPa) overpressure and for water temperatures of
a minimum of 194 °F / 90 °C.
This also applies for associated connection fittings. Miele original re-
placement parts fulfil these requirements.
The temperature of the hot water inlet must not exceed 158°F
(70°C) on machines with electric heating (EL).
The temperature of the hot water intake must not exceed
194°F (90°C) on machines without heating (EH).
The machine must be connected to the water supply using the inlet
hoses provided.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pwm 916Pwm 920

Table of Contents