Peak-Load Cut-Out; Communication Module; Operating Data - Miele PW 814 Operating And Installation Instructions

Commercial washing machine
Table of Contents

Advertisement

Optional modules
50

Peak-load cut-out

When a peak-load signal is received, the heating is deactivated and
the programme stopped.
Activate the peak-load function.
The following message appears in the display:
1
Cottons hygiene
Prog. stopped. Peak load cut-out.
Programme will continue automatically.

The programme is resumed automatically when the peak-load
function finishes.

Communication module

The machine can be connected to a PC (personal computer) using
the communication module.
The slot for the module is located on the back of the machine.
An Editor programme is available for this from Miele.

Operating data

With the Operating data module, operating data can be read or
deleted via the  "Operating data" button either before programme
start or after the end of the programme.
1
Cottons hygiene
2
Cottons universal
3
Cottons intensive
Press the  "Operating data" button.
When the  button is pressed, the following appears in the display:
Operating data module
Total data
Programme data
90
°C
60
°C
60
°C

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pw 811Pw 818

Table of Contents