Keysight Technologies N9030A Installation Note page 43

Pxa signal analyzer. option mtu, multitouch user interface upgrade kit option mtp, multitouch user interface upgrade kit with pc6 cpu
Hide thumbs Also See for N9030A:
Table of Contents

Advertisement

11.Refer to
Figure
30. Connect the ribbon to the BBIQ Interface Board.
12.Install two N9020-20017 Hex screws (1) to secure the flex ribbon into the connector. Torque
to 4 in-lbs with the ¼-inch socket.
Figure 30
Inverter Ribbon Cable Installation
Installation Note N9030-90098
Option MTU and MTP, MultiTouch User Interface Upgrade Kits
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9030ak-mtuN9030ak-mtp

Table of Contents