User Maintenance window
Perform any of the following tasks at this window:
•
water blank measurement
•
cell blank measurement
•
batch printing
•
filing of measurement data
•
save of text file
System Monitor window
Perform any of the following tasks at this window:
•
verify operating conditions (daily procedures)
•
set the system monitor (system settings)
System Maintenance Monitor window
Perform any of the following tasks at this window:
•
enter schedules for maintenance tasks
•
monitor the maintenance status of the system
•
delete maintenance records
Lamp Energy Monitor window
Perform any of the following tasks at this window:
•
check the spectrophotometer lamp energy
•
perform offset analog to digital (AD) measurement
ISE Operation window
Use this window to perform various ISE tasks.
There is a display area at the top of the window where you can view the running status.
Perform any of the following tasks at this window:
•
buffer prime
•
calibration
•
wash electrode
•
CV check
•
interval check
•
selectivity check
•
final operation
System Overview
•
manual operation
•
ISE line wash
•
Dilution bowl drain
•
initialize
•
batch print
•
periodic wash
•
enter information about each electrode
47