After Completion Of Maintenance - Siemens ARCADIS Varic Maintenance Instruction

Hide thumbs Also See for ARCADIS Varic:
Table of Contents

Advertisement

General information and overview
To ensure compliance with the applicable provisions of the Federal Performance Stan-
dard, the user of the equipment has to ensure that the maintenance procedure described
below is performed at intervals of six months or less. In case the user does not comply
with these requirements, the manufacturer can no longer be held liable.
If the results of any of the tests described in this document exceed the tolerances given,
the required adjustments must be performed.
Contact Siemens service.
After performing any adjustment, all applicable tests must be repeated.
Customer:
BZ-No.:

After completion of maintenance:

I hereby certify that all procedures described in these maintenance instructions have been
completed as specified and that the tolerance values are within the accepted range.
Siemens AG
Medical Solutions
Customer No.:
Type No.:
_____________
Date
SPR2-310.662.01
Rev. 02
05.06
2
Room:
Serial No.:
__________________
Signature
Page 1 of 2
CS PS SP
2 - 1
2
ARCADIS Varic

Advertisement

Table of Contents
loading

Table of Contents