Shut Down - Thermo Scientific Dionex UltiMate 3000 Series Operating Instructions Manual

Solvent racks
Hide thumbs Also See for Dionex UltiMate 3000 Series:
Table of Contents

Advertisement

UltiMate 3000 Series:
SRD-3x00 Solvent Racks

5.5 Shut Down

Observe the following precautions before interrupting the operation or before shipping the
SRD:
Thoroughly rinse the degasser with methanol or isopropanol after operation.
For longer periods of inactivity and when using saliferous buffers (which may result in
salt crystallization in the gas separation membrane, thereby impairing the degassing
performance), rinse with de-ionized water followed by either methanol or isopropanol.
Ship the SRD only in the original shipping container and observe the packing
instructions.
If the original shipping container is not available, appropriate shipping containers and
packing material can be ordered from Thermo Fisher Scientific sales organization for
Dionex HPLC products. The packing instructions are included in the "Installation and
Qualification Documents for Chromatography Instruments" binder and are available on
request.
Shipping the module in any other packaging automatically voids the warranty. For more
information, see the warranty statement in the terms of sale.
When the SRD is connected to the pump of the UltiMate 3000 system and when you are
running Chromeleon, you can set the pump with the SRD and HPLC system into the
standby mode or automate system shutdown. (For more information, see the Pump and/or
NCS/NCP manuals and the Chromeleon Help.)
Page 36
Operating Instructions

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srd-3x00 seriesSrd-3600Srd-3400Srd-3200

Table of Contents